GIZ:Request for Expression of Interest (EOI) Supply of BOQs materials and Installation of roof top and ground mounted Solar PV installation for WFP Agricultural rice milling hub in Zimmi and Rokupr

GIZ:Call For Expression of Interest For GIZ Consultants and Consulting Firms Database Update For 2025

Request for Expression of Interest (EOI) Supply of BOQs materials and Installation of roof top and ground mounted Solar PV installation for WFP Agricultural rice milling hub in Zimmi and Rokupr

Cosoft N°: 83492336

Project Number: 14.2275.7-338.00

The Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH is currently implementing the following Project: Transformational Energy Use for Sierra Leone – Phase 1” (TEUSL-1)

The “Transformational Energy Use for Sierra Leone – Phase 1” (TEUSL-1) is a multi-donor action jointly co-financed by the European Union and the German Federal Ministry for Economic Cooperation and Development, BMZ and implemented by GIZ as a contribution to the multi-donor initiative Energising Development (EnDev), which is also financed by the Netherlands Ministry of Foreign Affairs, the Norwegian Ministry of Foreign Affairs (NORAD), the German Federal Ministry for Economic Cooperation and Development, and the Swiss Agency for Development and Cooperation (SDC).

As part of this project, GIZ intends to award contract/s for the Supply and Installation of two (2) Hybrid roof top and ground mounted Solar PV Systems for World Food Programme (WFP)Agricultural rice milling hubs.

Exact explanation of the two sites

This contract will cover two (2) sites: Zimmi in Pujehun District (15.4 kWp) and Rokupr in Kambia District (18.7 kWp). Battery Energy Storage Systems (BESS) will be installed using a combination of Hybrid rooftop and ground-mounted structures. At Zimmi, the system will comprise ground-mounted galvanised steel or aluminium structures at a 15-degree tilt with 1.5 metres of clearance and a layout of two module strings, each containing 14 panels. At Rokupr, corrosion-resistant materials will be used for the rooftop and ground supports to ensure waterproofing and long-term structural stability. All structures will be oriented to maximise solar exposure and prevent shading.

The scope of task includes transporting PV system components (modules, inverters, batteries, mounting structures and cabling, to both sites, as well as manual offloading) safeguarding materials, removing waste and cleaning the site. Installation work will include internal wiring for lighting and sockets, setting up hybrid inverters and BESS in newly built secure rooms, and fully commissioning the systems. The exact Bill of Quantity (BoQ) will be provided to the applicants. The contractor will also provide technical documentation and conduct user training to ensure the systems are operated safely and efficiently.

The implementation will be at the location below:

• Zimmi, Pujehun District – 15.4Kwp

• Rokupr, Kambia District – 18.7Kwp

The scope of works in the four listed sites above requires the supply of BOQs materials and Installation of Hybrid Solar PV System for WFP Agric rice milling hub including but not limited to the following:

1) Supply of all necessary equipment and materials BOQ

2) Transportation of materials to the sites  

3) Erection and installation of all electrical components PV modules, inverters and BESS

4) Integration of back up diesel generators  

5) Conducting site acceptance tests  

6) System commissioning  

7) Provide introductional O&M training to facility users and their technicians. 


Tender procedure from invitation to tender until signing of contract is expected to take place in July 2025. Service installation work is expected to be performed and completed approximately within minimum month from signing of contract.

To qualify for consideration in the tender procedure, interested companies are required to submit the following information and documents for eligibility assessment:

1) Official letter expressing interest.

2) Company details including full company name, full address, phone and email.

3) Copy of company registration certificate.

4) Copy of valid NaSSIT Clearance Certificate.

5) Copy of Valid NRA – Tax Clearance.

6) Company profile including number of employees (permanent / temporary in total) and number of professional staff qualified to perform the work (at least 5 staffs), each for the last three (3) years  

7) References of not less than (3) works of similar nature (solar PV systems above 15 kWp or Car Port PV solutions) as specified above (performed within the last five (3) years) and at least 3 years’ working experience in the Western Africa region. Minimum commission value 5000 Euro or equivalent.

8) Annual total turnover for each of the last three (3) years; (2022, 2023 & 2024) with an average value of not less than Eight Hundred Thousand New Leones (800,000 New Leones). Should be proved through annual financial statement.

9) Evidence of experience in supplying BOQ materials and installation of solar hybrid PV systems 

Failure to submit the above administrative documents will lead to an exclusion.

Participants will be evaluated based on the requirement of administrative documents above and on their technical experience (see evaluation grid below for the technical experiencebelow):

• Experience in construction of ground mounted and roof top PV solutions, minimum one (1) each, with a size of 15 kWp or above (50%)

• At least one (1) Electrical engineer with at least 5 years working experience in the Renewable energy sector or equivalent qualification with a project management background and demonstrated experience in implementing hybrid microgrid projects with energy storage systems. (25%)

• Evidence of ownership of installation equipment and machinery necessary to execute the works or evidence of the possibility of hiring the same. (20%)

• Experience in Sierra Leone (5%)

Companies with a mark below 70% will be excluded 

The information and documents specified above shall be submitted ONLY via mail to SL_Quotation@giz.de not later than the 16th of July 2025   

NOTE:

The size of the EOI is limited to 30MB and not more than 50 pages. In case your EOI exceeds the maximum data size, documents must be sent via file transfer.

Additionally, if your bid file is greater that 10MB, we recommend that you split the EOI into several emails (<10MB).

Your email must be titled: Cosoft 83492336_Expression of Interest for the Supply and Installation of Hybrid Solar PV System

Note: Please do not send technical or price offer or other documents not requested. Kindly note that complete tender documents will be sent to all companies that will be assessed as eligible by GIZ based on the information and documents submitted as specified above.